Cooling and capacity for data centers
Edviro fits a physics model to your own telemetry, keeps it calibrated, and shows how much cooling headroom each pod has. You can try a new row, a unit failure or a setpoint change on the model before anything changes on the floor.
Read-only. Nothing new installed. Your team decides every change.
How do you measure data center cooling headroom?
Cooling headroom is how much more IT load a room or pod can take before rack inlet temperatures cross the design limit. Edviro works it out with a physics model calibrated to the site’s own BMS, power and sensor telemetry, and checks the model against measured temperatures. Operators can then try changes such as new racks or a unit failure on the model first.
Why capacity ends up a guess
How the model works
Edviro fits a physics model to your own telemetry and recalibrates it as load and layout change. Pod 3 on this page is a made-up example.
The model is fitted to the site’s own BMS, power and sensor telemetry, continuously.
Modeled inlet temperatures are compared with measured ones and the gap is shown. In the Pod 3 example it is ±0.4 °C, an illustrative figure.
Each pod shows its current load, its modeled limit and the headroom between them.
Try a change on the model first
Raising setpoints and measuring the result
What Edviro can and can’t change
Add racks, replace a unit or wait
Questions about cooling
Is this CFD?
No. It’s a model fitted to your own telemetry and recalibrated continuously, where a CFD study is usually done once.
Does Edviro change setpoints?
No. It models the change. Your team decides and makes it.
What data does the model need?
BMS, cooling plant (CRAH/CRAC, chilled water), power and rack inlet sensors.
How accurate is it?
Edviro shows modeled against measured inlet temperatures for your site, so you can see the gap yourself. The Pod 3 figures on this page are illustrative.
Does it handle liquid cooling?
That depends on the site. We’ll go through it with you on the demo call.
Can we plan a new build?
You can test changes against the model before you build. How far that goes for a new site is something we’ll go through on the demo call.
See what Edviro finds in your buildings.
Pick a 30-minute slot and we’ll walk through your sites with you.
Book a demoOr email founders@edviroenergy.com